Difference between revisions of "Deliverable 3.2"

From MAGEEC
Jump to: navigation, search
(Created page with "Category:Deliverables =Deliverable 3.2: Working power measurement hardware= ==Status: Complete== The MAGEEC power measurement hardware has been manufactured and is worki...")
(No difference)

Revision as of 13:26, 29 August 2013


Deliverable 3.2: Working power measurement hardware

Status: Complete

The MAGEEC power measurement hardware has been manufactured and is working and available for experimentation on.

Here is an image of the hardware:

We have also created a Youtube video of it being used in combination with an experimental version of the energy testing framework and the BEEBS benchmarks.

The hardware has been tested and is compatible with our work flow and gives accurate results.