Milestones

From MAGEEC
Revision as of 10:04, 3 April 2013 by Simoncook (talk | contribs) (Initial Milestones Plan)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Note: This does not include those which are recurring

Ref Title Work Package Responsibility Due Date Cost to Milestone (£) Notes
WP1/1 Decision of GCC/LLVM for first implementation WP1 SC 2013-08-31
WP1/2 Design documentation for compiler integration, machine learning interface and available features WP1 SC 2013-08-31 Iterative design, live document
WP2/1 First iteration of implementation, testing, documentation with first compiler WP2 SC 2013-11-30
WP2/2 Second iteration of development using second compiler WP2 SC 2013-11-30
WP3/1 Board Design Documentation WP3 2013-07-31
WP3/2 Working Hardware WP3 2013-07-31
WP4/1 Training set and case study sources WP4 2013-09-30
WP4/2 Embedded systems set up for testing WP4 2013-09-30 Physical setup internal, documentation external
WP5/1 Literature Review WP5 2013-07-31 May be appropriate for publication
WP5/2 Selection of core learning algorithm(s) and training approach WP5 2013-08-31 Output of working days
WP5/3 API for implementers WP5 2013-09-30 Output of working days
WP5/4 Review of approach WP5 2013-12-31 May be appropriate for publication
WP6/1 Paper identifying characteristics suitable for compiler optimisation passes WP6 2013-08-31
WP7/1 Working training infrastructure (existing optimisations) WP7 2014-02-28
WP7/2 Results from proof of concept training and test (existing optimisations) WP7 2014-02-28 This is proof of concept, not the evaluation
WP7/3 Working training infrastructure (new optimisations) WP7 2014-05-31
WP7/4 Results from proof of concept training and test (new optimisations) WP7 2014-05-31 This is proof of concept, not the evaluation
WP8/1 Design optimisation passes WP8 2014-02-28
WP8/2 Implement optimisation passes in GCC WP8 2014-02-28
WP8/3 Implement optimisation passes in LLVM WP8 2014-05-31
WP9/1 Trained and tested complete system with full case studies WP9 2014-08-31
WP9/2 Draft paper presenting results WP9 2014-08-31
WP9/3 Final paper WP9 2014-11-30 This is the ultimate report and it is anticipated that it will take some time to develop.