<center>'''Meeting UoB 22 July 2013'''</center>
+
==== Present ====
 +
[[JB]], [[SC]], [[MG]], [[AW]], [[JP]], [[SH]], [[KE]], [[OR]]
  
  
<center>Present: JB, SC, MG, AW, JP, SH, KE, OR</center>
+
== Hardware Energy Monitoring Report (Ashley) ==
 
 
 
 
'''Hardware Energy Monitoring Report (Ashley)'''
 
  
 
* Slow progress due to needing to get the hardware working
 
* Slow progress due to needing to get the hardware working
Line 13: Line 11:
 
** Capable but the level of additional soldering required, lack of voltage divider and need for external resistors makes it less easy to use for V2.
 
** Capable but the level of additional soldering required, lack of voltage divider and need for external resistors makes it less easy to use for V2.
 
* Benchmarks working and verification of their correctness being worked on.
 
* Benchmarks working and verification of their correctness being worked on.
** TODO: Now a priority to push on internal verification code to the tests.
+
** '''TODO''': Now a priority to push on internal verification code to the tests.
 
*** e.g. compare outputs to pre-computed correct and return result.
 
*** e.g. compare outputs to pre-computed correct and return result.
 
* When running the benchmarks, we should apply techniques such as <tt>extern</tt>s or <tt>volatile</tt>s that can store e.g. the final result.
 
* When running the benchmarks, we should apply techniques such as <tt>extern</tt>s or <tt>volatile</tt>s that can store e.g. the final result.
 
** Dijkstra program not working, others are.
 
** Dijkstra program not working, others are.
* TODO: Get the benchmarks (BEEBS / BBS) work for last year out there with more oomph (webs, publicity, workshops...)
+
* '''TODO''': Get the benchmarks (BEEBS / BBS) work for last year out there with more oomph (webs, publicity, workshops...)
  
 
* James 13th 14th September will give a talk at OSHCAMP on energy monitoring board design.
 
* James 13th 14th September will give a talk at OSHCAMP on energy monitoring board design.
* TODO: Run code that straddles flash banks and runs on flash to see differences in energy → feeds well into 'discovery' phase of ML.  
+
* '''TODO''': Run code that straddles flash banks and runs on flash to see differences in energy → feeds well into 'discovery' phase of ML.  
  
'''MAGEEC Blog posts'''
+
==MAGEEC Blog posts==
  
 
* Weekly (ish) blogs, from rotating members of the team.
 
* Weekly (ish) blogs, from rotating members of the team.
* TODO: 22/07/2013: Jeremy this week for an intro
+
* '''TODO''': 22/07/2013: Jeremy this week for an intro
* TODO: 29/07/2013: Ashley next week for intro to energy monitoring hardware.
+
* '''TODO''': 29/07/2013: Ashley next week for intro to energy monitoring hardware.
 
** Ensure the draft is saved.
 
** Ensure the draft is saved.
 
** Andrew will perform the final publishing
 
** Andrew will perform the final publishing
* TODO: 05/07/2013: Moon, intro to his work.
+
* '''TODO''': 05/07/2013: Moon, intro to his work.
  
'''Compiler Framework'''
+
==Compiler Framework==
  
 
* No new update on implementation, due to attending GCC meeting etc.
 
* No new update on implementation, due to attending GCC meeting etc.
Line 40: Line 38:
 
*** Can some examples of data be generated so that it can be represented for ML learning.
 
*** Can some examples of data be generated so that it can be represented for ML learning.
  
'''MILEPOST Approach'''
+
==MILEPOST Approach==
  
 
* <nowiki>Normalised feature vector 0<= 1 using the number of instructions as the divider.</nowiki>
 
* <nowiki>Normalised feature vector 0<= 1 using the number of instructions as the divider.</nowiki>
Line 49: Line 47:
 
** Data set available by end of week.
 
** Data set available by end of week.
 
** Performance as metric.
 
** Performance as metric.
* <nowiki>TODO: Paper on James' previous work? Of 130 flags in GCC only 13 make a difference [in our scenarios]. We want to understand why.</nowiki>
+
* '''TODO''': <nowiki>Paper on James' previous work? Of 130 flags in GCC only 13 make a difference [in our scenarios]. We want to understand why.</nowiki>
 
* Consider systematic (FFD) vs exhaustive vs random selection and their effectiveness.
 
* Consider systematic (FFD) vs exhaustive vs random selection and their effectiveness.
 
** Part of the MSc work will address this.
 
** Part of the MSc work will address this.
Line 58: Line 56:
 
* There are techniques for looking at flag dependencies, but they need further investigation.
 
* There are techniques for looking at flag dependencies, but they need further investigation.
  
'''Framework representation for enabling ''later'' advanced ML work'''
+
==Framework representation for enabling ''later'' advanced ML work==
  
 
* Reference SC's previous Overall Design slide.
 
* Reference SC's previous Overall Design slide.
Line 72: Line 70:
 
* How to support backtracking prediction.
 
* How to support backtracking prediction.
 
** Unlikely in GCC due to global state.
 
** Unlikely in GCC due to global state.
* TODO: SC to produce a draft spec by 31/07/2013
+
* '''TODO''': [[SC]] to produce a draft spec by 31/07/2013
  
'''Planning'''
+
==Planning==
  
 
* Hardware design and build completed on time.
 
* Hardware design and build completed on time.
 
* No new streams of work coming online.  
 
* No new streams of work coming online.  
 
* All else proceeding OK.
 
* All else proceeding OK.
* TODO: By 29/07/2013: Action the kit buying  
+
* '''TODO''': By 29/07/2013: Action the kit buying  
 +
 
 +
==Actions carried forward from previous meeting:==
  
'''Actions carried forward from previous meeting:'''
+
* [[SH]]: Apply for BlueCrystal Accounts for all
 +
* [[KIE]]: To decide on whether for two PCs with 32GB was one PC with two cores and much more RAM
  
* SH: Apply for BlueCrystal Accounts for all
+
[[Category:Meetings]]
* KIE: To decide on whether for two PCs with 32GB was one PC with two cores and much more RAM
 

Latest revision as of 10:20, 23 July 2013

Present

JB, SC, MG, AW, JP, SH, KE, OR


Hardware Energy Monitoring Report (Ashley)

  • Slow progress due to needing to get the hardware working
    • Software installation / OS issues
  • Moved to use a previous version (V2) energy-monitor boards, since they are more suitable
  • Problems using V3 to measure external device energy consumptions
    • Capable but the level of additional soldering required, lack of voltage divider and need for external resistors makes it less easy to use for V2.
  • Benchmarks working and verification of their correctness being worked on.
    • TODO: Now a priority to push on internal verification code to the tests.
      • e.g. compare outputs to pre-computed correct and return result.
  • When running the benchmarks, we should apply techniques such as externs or volatiles that can store e.g. the final result.
    • Dijkstra program not working, others are.
  • TODO: Get the benchmarks (BEEBS / BBS) work for last year out there with more oomph (webs, publicity, workshops...)
  • James 13th 14th September will give a talk at OSHCAMP on energy monitoring board design.
  • TODO: Run code that straddles flash banks and runs on flash to see differences in energy → feeds well into 'discovery' phase of ML.

MAGEEC Blog posts

  • Weekly (ish) blogs, from rotating members of the team.
  • TODO: 22/07/2013: Jeremy this week for an intro
  • TODO: 29/07/2013: Ashley next week for intro to energy monitoring hardware.
    • Ensure the draft is saved.
    • Andrew will perform the final publishing
  • TODO: 05/07/2013: Moon, intro to his work.

Compiler Framework

  • No new update on implementation, due to attending GCC meeting etc.
  • GCC meeting feedback is that HPC community (inc. LLL) very interested into learning more about low power.
  • Looked at the research questions posted from UoB discussion on the wiki.
    • Profile-directed optimisation is very powerful, perhaps most powerful
    • Joern to be quizzed by James about the kinds of profile data that comes out, since it can impact the machine learning.
      • Can some examples of data be generated so that it can be represented for ML learning.

MILEPOST Approach

  • Normalised feature vector 0<= 1 using the number of instructions as the divider.
  • Ran 1000 random on/off flags, then kept the top 5% of previously trained data.
  • Question on whether or not the flags are orthogonal.
  • MSc student is addressing:
    • Taking James' flags of significance and isolating these and exhaustively
    • Data set available by end of week.
    • Performance as metric.
  • TODO: Paper on James' previous work? Of 130 flags in GCC only 13 make a difference [in our scenarios]. We want to understand why.
  • Consider systematic (FFD) vs exhaustive vs random selection and their effectiveness.
    • Part of the MSc work will address this.
  • Moon investigating which of the MILEPOST vectors are and are not useful. Needs a large data set of 150+ applications to check them.
    • Work on WCET to extract additional programs to help with this.
    • Look (longer term) at HPC space to augment these.
  • MILEPOST Approach Summary: Run with 1000 flags randomly. Having discarded invalid flags, take top 100 good ones and run accumulating stats showing which are in best sets between iterations
  • There are techniques for looking at flag dependencies, but they need further investigation.

Framework representation for enabling later advanced ML work

  • Reference SC's previous Overall Design slide.
  • Oliver outlined the “credit assignment” problem for ML to infer what causes improvement.
  • gen_features() just gives a list of passes that will be run.
  • Mapping of passes to flags needed.
  • A lot of debate about whether to use a feature vector, IR or source code for selecting the relevant features for ML.
  • Main takeaway – we need to be able to cope with changes in the features that are relevant as our knowledge of this evolves.
    • Feature info passing should be generic (enough to be able send IR, if necessary).
    • Should plan for plugin re-write next year if necessary to aid this.
  • How to support backtracking prediction.
    • Unlikely in GCC due to global state.
  • TODO: SC to produce a draft spec by 31/07/2013

Planning

  • Hardware design and build completed on time.
  • No new streams of work coming online.
  • All else proceeding OK.
  • TODO: By 29/07/2013: Action the kit buying

Actions carried forward from previous meeting:

  • SH: Apply for BlueCrystal Accounts for all
  • KIE: To decide on whether for two PCs with 32GB was one PC with two cores and much more RAM